Home > Services >
Structural Opening Permit
OUR SERVICES

Structural Opening Permit

Permit drawings and structural coordination for creating or enlarging openings in load-bearing walls, exterior walls, masonry walls, and other structural elements in Ontario.

Code Compliant & Safe

City Submission & Review Support

Fast, Clear Communication

Do You Need a Permit for a Structural Opening?

Yes. Creating or enlarging an opening in a structural wall usually requires a building permit and structural engineer review because beams, lintels, posts, foundations, and load paths may be affected.

What Structural Opening Permit Usually Involves

01
Opening scope review
02
Structural coordination
03
Permit drawings
04
Engineer details/stamp coordination
05
City comment support

Key Requirements for a Structural Opening Permit

Structural Opening Permit permit drawing example and review
  • Existing wall and proposed opening dimensions
  • Structural engineer design, review, and stamp where required
  • Temporary support and load-path considerations
  • Property information, address, and existing site conditions
  • Permit-ready drawings prepared to match the scope of work
  • Applicable Ontario Building Code and municipal zoning review
  • Coordination with structural, mechanical, or other consultants where the project requires it
  • Support responding to municipal plan examiner comments after submission

Need help preparing a structural opening permit submission?

Permit Works can review the project scope, prepare permit-ready drawings, coordinate consultant input where needed, and support the application through city comments.

Request a Permit Quote
or call (416) 989-8900

Our Permit Process

1
Quotation
We review your scope of work and provide a clear quotation.
2
Site Documentation
On-site measurement and information gathering
3
Design
We provide a preliminary design approximately 5–10 business days after the site visit, depending on project scope.
4
Permit Package
Once the design is confirmed, we prepare the permit package for city submission.
5
City Submission
We submit your application for city review.
6
Approval & Support
We respond to city comments and support the permit review process.

Drawings & Documents Typically Required

Existing and proposed floor plans
Structural opening location plan
Beam/lintel/post details from engineer where required
Wall section and construction details
Supporting photos or existing condition notes
Not all drawings listed above are required for every project. We confirm the required drawings based on your project scope, property, municipality, and permit requirements.

Common City Review Issues

Engineer design not included
Opening dimensions or location unclear
Load path not coordinated
Masonry or exterior wall details missing
Temporary support notes not addressed

What Our Clients Say About Us

4.6/5

Based on 75+ verified reviews

4.9/5

Based on 80+ verified reviews

Frequently Asked Questions

Start Your Structural Opening Permit Review

Share your project details with Permit Works and we can help identify the drawings, documents, and permit pathway needed before you submit.

Request a Permit Quote
or call (416) 989-8900